Saturday, May 30, 2026

Former Ethiopian Electric Power CEO charged with deforestation practices at GERD site

A total of 50 individuals have been charged in connection with deforestation practices at the Grand Ethiopian Renaissance Dam (GERD) site.
Among the individuals include, former CEO of the Ethiopian Electric Power, Engineer Azeb Asnake, and former Deputy Director General of Metals Engineering Corporation (METEC) Colonel Mulu Woldegebriel.
Engineer Azeb resigned as CEO of the Ethiopian Electric Power in August 2018.

Hot this week

Production up, but the ‘cost’ variable weighs heavily

Production is up in 2021 for the Italian agricultural...

Luminos Fund’s catch-up education programs in Ethiopia recognized

The Luminos Fund has been named a top 10...

Well-planned cities essential for a resilient future in Africa concludes the World Urban Forum

The World Urban Forum (WUF) concluded today with a...

Private sector deemed key to unlocking AfCFTA potential

The private sector’s role is vital to fully unlock...

Ethiopia opens Franco Valuta to investors and diaspora traders under new rules

The National Bank of Ethiopia (NBE) has officially enacted...

Ethiopia opens freight forwarding sector to foreign investors

The government’s latest move to liberalize the freight forwarding...

Our Voice, Our Future: Why the integrity of our election rest with us

Over the past few years, the people of Ethiopia...

Lai’s Eswatini stunt is a ‘diplomatic’ dead end

Taiwan leader Lai Ching-te’s early May visit to Eswatini...

NBE allocates USD 200 million for Q4 FX auctions

The National Bank of Ethiopia (NBE) has officially released...
spot_img

Related Articles

Popular Categories

spot_imgspot_img